This ambitious project aimed to create a dynamic live-work-play environment, featuring:
- Varied Construction: A blend of concrete construction on the lower levels and steel stud construction on the upper levels, with concrete stairway and elevator enclosures, requiring careful consideration of building codes and fire safety regulations.
- Residential Density: 115 dwelling units across multiple floors, requiring compliance with residential zoning, building codes, and accessibility standards.
- Mixed-Use Integration: Integrating a ground-floor parking garage, retail/restaurant space, and residential units, demanding careful coordination of access, utilities, and fire safety measures.
- Amenity Spaces: Incorporating a third-floor indoor amenity space and an exterior pool deck with a pool, requiring adherence to specific safety codes and regulations.
- Rooftop Access: Providing access to rooftop common decks via stairways and an elevator, necessitating compliance with rooftop safety and accessibility requirements.
Navigating the Permitting Process During Uncertain Times
This project's complexity was compounded by the unprecedented challenges posed by the COVID-19 pandemic. Here's how we helped our client navigate this unique situation:
- Code Cycle Update: We diligently tracked the City's code cycle update, which occurred mid-project during the pandemic shutdown. This required careful navigation of the new code requirements and revisions to the design to ensure ongoing compliance.
- Remote Collaboration: We adapted to the limitations imposed by the pandemic by leveraging technology for remote collaboration with the client, design team, and city officials. This ensured continued progress despite restrictions on in-person meetings.
- Proactive Communication: We maintained consistent communication with city staff throughout the shutdown, clarifying any uncertainties related to code interpretations and permitting procedures.
- Flexible Problem-Solving: We demonstrated flexibility and adaptability in response to evolving public health guidelines and city procedures, ensuring the project remained on track despite the challenging circumstances.
Outcomes
Our ability to navigate the complexities of the permitting process, coupled with our adaptability during the pandemic, resulted in a successful outcome for the client:
- Project Continuity: Despite the challenges posed by the pandemic and the code cycle update, we maintained project momentum and avoided significant delays.
- Code Compliance: Our thorough understanding of the evolving code requirements ensured the project met all applicable standards, both before and after the code update.
- Successful Completion: The client was able to proceed with construction and ultimately complete this dynamic mixed-use development, contributing to the vibrancy of the urban environment.
This case study highlights our ability to navigate not only complex permitting processes but also unforeseen challenges like a global pandemic and mid-project code changes. By combining technical expertise with effective communication, flexibility, and a proactive approach, we helped our client achieve a successful outcome despite the extraordinary circumstances.